|
|
|
![]() Inboard/outboard right wing joined and servo wiring harness channel completed with flap cable channel routed. |
![]() Preparing wing sheeting and sanding smooth on flat surface after sheeting strips are joined. |
![]() Flap cable assembly installed. |
![]() Wing joined with 6oz. fiberglass reinforcement. Servo wiring harness exit cutout complete, and flap servo mounting rails and cable assemblies installed and completed. |
![]() Flaps and ailerons cutout completed and hinge trim installed |
![]() Control surfaces glassed and drying.
|
| Complete glassing of the wing and control surfaces (Zpoxy Finishing Resin) recommended. Completing one panel (bottom first then the top) at a time. Have aileron servo cutouts before glassing. Use 3/4oz. glassing material for covering. | |